2nd Floor Schematic

2nd Floor Floorplan
Second Floor, South to North View

 

*Future Addition:

Note in the above drawing the addition (in blue) of the connection that spans between the new Engineering Classroom Building and current Engineering Lab Building. To prepare for the construction of this connection, plans are in place for renovation of the Engineering Lab Building and destruction of the breezeway and south (classroom) portion of the lab building.

Conceptual Drawings:

These conceptual drawings give a glimpse on what the connection would have appeared like. Click on any thumbnail to view a larger image. Images courtesy of Cooper Roberts Simonsen Architecture and Brixen & Christopher Architects.

View From Southwest
View from Southwest
Conceptual Drawing 2
View from West
Conceptual Drawing 3
Internal View from North
Conceptual Drawing 4
Internal View from South
Conceptual Drawing 5
Upper Level View

PDF View the 1st Floor Schematics

* The plans for the future addition were preempted for the David G. Sant Engineering Innovation Lab Building.